Spray painting was easy, it took about 24 hours (this includes the drying time ) :
- remove all the black parts (to remove the front locking mechanism you have to push out the axle)
- one layer of plastic primer
- 30 min of drying
- 2 layers of red paint (2 min drying time between them)
- 24 hours of drying
Changing the LEDs is a bit of a pain mostly because you have to drill out the old LEDs (cant get them out because of the glue used by Thermaltake, note to them: use some hot glue next time ), the hole operation took about 2-3 hours.